A scope considered within the whole project.

Automation, security systems and vehicle charging are most useful when planned around a building's actual use. Electrical capacity, communication infrastructure, equipment positions and user access need to work together. We bring these requirements into new construction and renovation discussions early enough for cable routes and interfaces to be coordinated.

What can the scope include?

  • Usage and equipment requirements review
  • Electrical and communication infrastructure
  • Automation and security-system interfaces
  • EV charging installation planning

Before the work begins.

Equipment selection follows the available supply, usage pattern and project requirements. Local electrical rules, access controls, inspection and connection responsibilities must be established. Compatibility between components and the scope of commissioning should be made clear before procurement.

Planning a project abroad? Share the country, city, design stage and required work package. The execution and delivery model is assessed for the project alongside local requirements. International projects ↗
Can EV charging be planned during construction?

Yes. Early planning helps reserve capacity, routes and equipment positions. The final solution depends on the supply, charging needs, selected equipment and applicable local requirements.