A scope considered within the whole project.

A rooftop solar project begins with the building's energy use and the suitability of its roof. Available area, orientation, shading, roof condition and electrical infrastructure influence what can be proposed. We bring these questions into the wider building discussion so that solar equipment and its interfaces are considered before procurement or construction decisions are made.

What can the scope include?

  • Roof and energy-demand information review
  • Electrical infrastructure coordination
  • Mounting and roof-envelope interfaces
  • Project-specific connection and approval planning

Before the work begins.

Capacity, generation and commercial assumptions require a project assessment; they are not guaranteed by a generic website estimate. Structural suitability, grid requirements and local authorisations must be reviewed by the relevant specialists. International enquiries are considered against the destination country's rules and delivery arrangements.

Planning a project abroad? Share the country, city, design stage and required work package. The execution and delivery model is assessed for the project alongside local requirements. International projects ↗
Can solar be included in a new building project?

Yes. Early coordination allows roof space, plant locations, cable routes and electrical needs to be considered together. A firm proposal follows the required technical and site assessment.