A scope considered within the whole project.

The structural stage turns design information into the building's physical frame. Formwork, reinforcement, concrete placement and site sequencing must follow the approved engineering design. Usta Istanbul evaluates the required structural work package alongside site conditions, access and the overall programme. New construction and defined subcontract work can be discussed through the same project enquiry process.

What can the scope include?

  • Structural work package review
  • Formwork and reinforcement coordination
  • Concrete work and construction sequencing
  • Interfaces with subsequent building trades

Before the work begins.

A meaningful offer requires structural drawings, quantities where available, ground information and responsibilities for materials, equipment and testing. Inspection and approval requirements are established with the relevant authorised professionals. International enquiries are assessed against local standards, labour arrangements and site logistics.

Planning a project abroad? Share the country, city, design stage and required work package. The execution and delivery model is assessed for the project alongside local requirements. International projects ↗
Which documents help price structural works?

Structural drawings, specifications, available quantities, ground information and a proposed schedule are helpful. The proposal should distinguish labour, materials, lifting, temporary works, testing and any exclusions.